Honda Chord + Cars of the Honda Accord brand + Settings and routine maintenance + Engine + Cooling systems, heating + Power supply system and release + Engine electric equipment + Engine management + Gear shifting box - Coupling and power shafts Coupling - the general information and check of a condition of components Removal and installation of the main cylinder of coupling Removal and installation of the executive cylinder of coupling Removal of air from a hydraulic path of the drive of switching off of coupling Removal, check of a state and installation of components of assembly of coupling Removal, check of a state and installation of the release bearing and fork of switching off of coupling Adjustment of a pedal of coupling Check of a state, replacement and adjustment of the sensor switch of disconnection of a chain of a starter Removal and installation of power shafts Removal and installation of an intermediate shaft Replacement of protective covers and check of a condition of CV JOINTS + Brake system + Suspension bracket and steering + Body + Onboard electric equipment + Schemes of electric equipment
|
Removal, check of a state and installation of the release bearing and fork of switching off of coupling
|
Remember that the dust produced in the course of wear of frictional overlays of the conducted clutch plate may contain noxious to health asbestos. Do not blow off dust compressed air and try not to inhale it. Do not apply to rubbing of components of coupling solvents on an oil basis, - use only special brake cleaners or pure methyl alcohol. Put the used rags in hermetically closed container. |
REMOVAL
CHECK
|
|
1. Holding the bearing for an external holder, press internal and rotate it. The bearing has to rotate freely and silently, otherwise it needs to be replaced. Wipe the bearing with pure rags and examine on existence of signs of wear, cracks and other mechanical damages. Usually replacement of the release bearing is made every time at service of components of coupling. Do not wash out the bearing in solvent in order to avoid violation of tightness of its assembly at all. |
2. Check the lever of switching off of coupling for existence of cracks and signs of deformations. |
|
INSTALLATION
|
|
1. Fill an internal flute of the release bearing refractory lubricant. Slightly grease with the same lubricant vents of a pin of a main shaft of the transmission and the holder of the bearing of the last. |
2. Grease with the same lubricant a nest under landing of a spherical finger from a reverse side of a fork of switching off, and also a nest under landing of a pusher of the executive cylinder.
3. Enter the release bearing into gearing with a coupling switching off fork. 4. Put on the bearing on the holder of the forward bearing of a main shaft of the transmission, at the same time passing the end of a fork of switching off through an opening in a coupling casing. Densely put a switching off fork on a sharovy finger of a spherical support. 5. Slightly grease with refractory lubricant the surface of the release bearing contacting to petals of a diaphragm spring. 6. Further installation is made as it should be, the return to an order of dismantle of components. |
|
|
|