|
Honda Accordof releaseRepair and operation of the car |
|
Honda Chord + Cars of the Honda Accord brand + Settings and routine maintenance - Engine + Four-cylinder engines + V6 engines - General and capital repairs of the engine Check of pressure of oil Check of compression pressure in cylinders Diagnostics of a condition of the engine with use of the vacuum gage Removal of the power unit from the car - preparation and precautionary measures Removal and installation of the engine Alternative versions of schemes of recovery repair of the engine Order of dismantling of the engine by preparation it to capital repairs Dismantling of a head of cylinders Cleaning and check of a condition of a head of cylinders Service of valves Assembly of a head of cylinders Removal and check of a condition of balancing shaft (4-cylinder engines) Removal of conrod and piston assemblies Removal of a bent shaft Cleaning of the block of the engine Check of a condition of the block of the engine Honingovaniye of mirrors of cylinders Check of a condition of components of conrod and piston group Check of a condition of a bent shaft Check of a state and selection of inserts of radical and conrod bearings of a bent shaft Engine assembly order Installation of piston rings Installation of a bent shaft and check of working gaps of radical bearings Installation of a back epiploon of a bent shaft Installation of conrod and piston assemblies and check of size of working gaps in conrod bearings of a bent shaft Installation of balancing shaft (four-cylinder engines) Trial start and running in of the engine after capital repairs + Cooling systems, heating + Power supply system and release + Engine electric equipment + Engine management + Gear shifting box + Coupling and power shafts + Brake system + Suspension bracket and steering + Body + Onboard electric equipment + Schemes of electric equipment https://glamorlady.ru: выносливые дети |
Order of dismantling of the engine by preparation it to capital repairs It is the simplest to carry out dismantling of the engine, having installed it on the portable assembly stand. Such adaptation can always be borrowed rather cheap in a workshop of car service. Before fixing the engine at the stand, it is necessary to remove from it a flywheel / a driving disk.If an opportunity to use the stand is absent, dismantling should be made, having placed the engine on a strong workbench, or having reliably arranged it on a firm floor of a garage. During the work without stand you watch that the engine incidentally did not overturn. If it is planned to make replacement of the engine by restored, remove with old all hinged units and external components and transfer them to the replaceable block. In number such, subject to shift, components enter: a) The generator with arms; b) The steering pump with arms; c) Components of systems of decrease in toxicity of the fulfilled gases; d) Distributor, VV of a wire and spark plug; e) The thermostat with a casing cover; f) Perepuskna branch pipe/hose of the water pump; g) Components of system of injection of fuel; h) Inlet pipeline and final collector(s); i) Oil filter j) Support of a suspension bracket of the power unit; k) Assembly of coupling (RKPP); l) Flywheel / driving disk;
At the choice of the scheme with use of the reduced set of the block consisting of the block of cylinders with established in it by a bent shaft and conrod and piston groups remove from the old unit also a head of cylinders, the pallet of a case and the oil pump (possible alternatives of schemes of performance of capital repairs see in the Section Alternative versions of schemes of recovery repair of the engine). When carrying out complete capital repairs of the old unit, make its dismantling and take all internal components. The optimum order of implementation of the procedure of dismantling of the engine is given below: a) Inlet pipeline and final collector(s); b) Cover (and) heads of cylinders; c) GRM drive covers with bolts; d) The GRM drive (a gas-distributing belt with cogwheels); e) Assembly of yokes with camshaft(s); f) Head (i) of cylinders; g) Water pump; h) Case pallet; i) Maslozabornik with the mesh filter; j) Forward cover / oil pump; k) Conrod and piston assemblies; l) Bent shaft and radical bearings; Before starting dismantling of the engine, prepare the following materials, tools and details (see also Section Engine Assembly Order): a) Standard set of the metalwork tool; b) A set of cardboard or plastic containers / plastic bags for organized storage of small components; c) A scraper for cleaning of the interfaced surfaces; d) A vertical drill for removal of step wear in the top part of cylinders; e) A stripper for dismantle of a damper of tortional fluctuations; f) Set of micrometers; g) Telescopic nutromer; h) Dial measuring instrument of plunger type (DTI); i) The tool for compression of valvate springs; j) Hon for processing of mirrors of cylinders; k) The tool for a clearing of flutes under installation of piston rings; l) Electric drill; m) Set of taps and lerok; n) Wire brushes; o) Cylindrical brushes for a clearing of oil galleries; p) Solvent. |
|