Honda Accord

of release

Repair and operation of the car



Honda Chord
+ Cars of the Honda Accord brand
+ Settings and routine maintenance
- Engine
   + Four-cylinder engines
   - V6 engines
      Preparatory actions and the list of repair procedures which can be executed without extraction of the engine from the car
      Reduction of the piston of the first cylinder in the provision of the top dead point (TDP)
      Removal and installation of covers of heads of cylinders
      Removal and installation of the inlet pipeline
      Removal and installation of final collectors
      Removal, check of a state and installation of a gas-distributing belt and cogwheels of the GRM drive
      Replacement of a forward epiploon of a bent shaft
      The VTEC system - the general information
      Removal, check of a state and installation of assembly of yokes
      Removal, check of a state and installation of camshafts
      Replacement of maslootrazhatelny caps and valvate springs with plates
      Removal and installation of heads of cylinders
      Removal and installation of the pallet of a case of the engine
      Removal, check of a state and installation of the oil pump
      Removal and installation of a driving disk
      Replacement of a back epiploon of a bent shaft
      Check of a state and replacement of support of a suspension bracket of the power unit (V6 Engines)
      System of correction of a suspension bracket of the power unit - the general information and check of serviceability of functioning
   + General and capital repairs of the engine
+ Cooling systems, heating
+ Power supply system and release
+ Engine electric equipment
+ Engine management
+ Gear shifting box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schemes of electric equipment


Горит лампочка абс причина

Removal and installation of final collectors

Start implementation of the procedure only after final cooling of the power unit.

REMOVAL

 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped with a security code before disconnecting the battery make sure that you have the correct combination for input of the audio system in action!

2. Impregnate fixture of collectors with the getting structure.
3. Prop up antiretractable boots back wheels. Cock the parking brake and transfer the AT selector lever to situation "P". A car front also establish to Poddomkratta it on props. Remove the lower antispray screen.

4. Disconnect reception pipes of system of production of the fulfilled gases from final collectors.

Fixture of pipes will be also reasonable to be impregnated with in advance getting structure.

5. Turn out fixing bolts and remove thermofilters from final collectors (also expediently previously to impregnate fixture with the getting structure).

6. Give самоконтрящиеся nuts and remove collectors from heads of cylinders.

Самоконтрящиеся nuts at assembly are subject to replacement without fail.

7. Attentively examine both collectors and their fixture on existence of cracks and other mechanical damages, replace defective parts.

INSTALLATION

 PERFORMANCE ORDER

1. By means of a scraper remove the remains of sealant and traces of material of old laying from the interfaced surfaces of final collectors and heads of cylinders. Wipe surfaces with the rags moistened in acetone. If suspicions on leaks took place, check planeness of collectors, in case of need give the deformed components to a pro-point.
2. Put on new laying the fixing hairpins which are closed up in heads of cylinders.
3. Establish collectors, oil hairpins motive and screw new самоконтрящиеся fixing nuts. Moving from the center of a collector outside, passing from one fastener to another in a diagonal order, in three stages tighten nuts with the required effort.

On collectors identification tags in the form of letters of "F" (forward) and "R" (back) which are not allowing to mix components are provided.

4. The remained components are installed as it should be, the return to an order of their dismantle.
5. Start the engine and check it for existence of signs of leak of the fulfilled gases through joints of final collectors with heads of cylinders and reception pipes of system of release.