Honda Accord

of release

Repair and operation of the car



Honda Chord
+ Cars of the Honda Accord brand
+ Settings and routine maintenance
- Engine
   - Four-cylinder engines
      Preparatory actions and the list of repair procedures which can be executed without extraction of the engine from the car
      Reduction of the piston of the first cylinder in the provision of the top dead point (TDP)
      Removal and installation of a cover of a head of cylinders
      The VTEC system - the general information and check of a condition of components
      Removal, check of a state and installation of assembly of yokes
      Replacement of maslootrazhatelny caps and valvate springs with plates
      Removal and installation of the inlet pipeline
      Removal and installation of a final collector
      Removal, check of a state and installation of cogwheels and belt of the drive of balancing shaft
      Removal, check of a state and installation of a gas-distributing belt and cogwheels of the GRM drive
      Replacement of a forward epiploon of a bent shaft
      Removal, check of a state and installation of the camshaft
      Removal and installation of a head of cylinders
      Removal and installation of the pallet of a case of the engine
      Removal, check of a state and installation of the oil pump
      Removal and installation of a flywheel / driving disk
      Replacement of a back epiploon of a bent shaft
      Check of a state and replacement of support of a suspension bracket of the power unit
      System of correction of a suspension bracket of the power unit - the general information and check of serviceability of functioning
   + V6 engines
   + General and capital repairs of the engine
+ Cooling systems, heating
+ Power supply system and release
+ Engine electric equipment
+ Engine management
+ Gear shifting box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schemes of electric equipment



Removal, check of a state and installation of the oil pump

REMOVAL

 PERFORMANCE ORDER

1. Take off a gas-distributing belt and a belt of the drive of balancing shaft (see the Sections Removal, check of a state and installation of cogwheels and a belt of the drive of balancing shaft and Removal, check of a state and installation of a gas-distributing belt and cogwheels of the GRM drive). Remove a cogwheel of a forward balancing shaft and assembly of a casing of a gear wheel of a back balancing shaft. Disconnect an electrical wiring of the sensor of ICR/BMT from the main braid. Turn out four fixing bolts and remove the sensor from the case of the oil pump.
2. Remove the engine case pallet (see the Section Removal and installation of the pallet of a case of the engine).

3. Disconnect assembly of a maslozabornik with the mesh filter and a tube from the bridge of covers of radical bearings and a pump housing.

4. Turn out fixing bolts and remove the oil pump from the engine.

5. Turn out fixing screws and uncover with the pump.

Not to break a vent in heads of fixing screws it is better to make their easing by means of an impact driver.

CHECK

 PERFORMANCE ORDER

1. Measure the size of working gaps of gear wheels of the pump. Compare results of measurements to requirements of Specifications. If the size of gaps goes beyond admissible values, replace the pump.

2. Turn out a stopper of the reducing valve and take from a nest in a pump housing a valvate spring and a plunger. Check a spring for existence of deformations, and a plunger - for existence of scratches and zadir. Defective components are subject to replacement.
3. Establish gear wheels in a pump housing and fill cavities between their teeths technical vaseline (as initial filling at primary start).
4. Grease screws of fastening of a cover of the pump with the anti-taking sealant. Establish a cover, screw screws and tighten them with the required effort. Establish a spring and a plunger of the reducing valve in a pump housing. Having replaced a sealing washer, screw a stopper and strongly tighten it.

INSTALLATION

 PERFORMANCE ORDER

1. Slightly grease with RTV sealant the pump housing surface interfaced to the block. Make sure available on the place of the directing pin and install the pump, previously having replaced sealing rings. Grease with RTV sealant a carving of fixing bolts, screw them and tighten with the required effort.

Installation of the pump has to be made within 5 minutes after sealant imposing. Track that lysk in an internal gear wheel of the pump were combined with reciprocal lyska on a pin of a bent shaft.

2. Establish on a back balancing shaft assembly of a cogwheel with a gear wheel casing. Afterwards establish a gas-distributing belt and a belt of the drive of balancing shaft.
3. Install into place the sensor of ICR/BMT, having tightened bolts of fastening it to the pump with the required effort. Restore initial connection of an electrical wiring.
4. Establish into place assembly of a maslozabornik, having tightened fixing bolts with the required effort (do not forget to replace sealing laying).
5. Install the case pallet (see the Section Removal and installation of the pallet of a case of the engine).
6. Further installation is made as it should be, the return to a dismantle order. In conclusion do not forget to fill in engine oil in the engine and to fill the cooling system (see the Head Nastroyki and routine maintenance).
7. Start the engine and check its existence of signs of leaks.